what is the logical concrete mix design for M 30 Grade and the
cement consumption per M3
Answers were Sorted based on User's Feedback
Answer / navin baranwal
Grade of M30 concrete in 1:1:2 and the cement consumption
is 368 kg/cum.
| Is This Answer Correct ? | 8 Yes | 5 No |
Answer / vijender sharma
Logic of M30 concrete Mix = strength concrete, ratio of cement depend by design mix of M30 concrete, per/M³ 8.4bags by volume
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / vinayak
cement consuption depend upon the physical & chemical
properties of cement
| Is This Answer Correct ? | 0 Yes | 4 No |
Answer / tarsem
m30 grade 1:1:2 and total cement used in m3 i think 7.2
bags .so pls all my friends Is this ans correct and no
plz reply my friends
| Is This Answer Correct ? | 0 Yes | 6 No |
Answer / fathi abu sabha
GRAD M30 1:2:4 , CEMENT :SAND :AGGREGATE AND 150 LITTER
WATER
| Is This Answer Correct ? | 1 Yes | 8 No |
Specific gravity of cement?
why moment is create in fixed beam. And why moment is not create in simply support beam
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
What is the DENSITY of 20mm Course aggregate?
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
Please any body describe me manpower used calculation for a building construction.
1 Answers Metro Constructions,
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how the sand fail?
what if i want to lap a 20mm dia and a 16mm dia together wat will be the lap length?? a) 1m b) 80mm
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
What is the method of soil replacement test?
Formula for calculating the volume of bulb in underreamed pile
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)