Answer / harshitha
The velocity of with which the approaches or reaches the weir or notch before it flows over it.
| Is This Answer Correct ? | 28 Yes | 10 No |
Answer / sparsh jandial
It is the velocity at which two objects move towards or away from each other.
If objects are moving towards each other than Velocity of approach is turned positive or else negative.
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / garima sawhney
Velocity of approach may be defined as the velocity with which water in the channel approaches the weir before it flows over it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / zia ullah
The average velocity of water in a channel at the point where the depth over a flow measuring weir is recorded.
| Is This Answer Correct ? | 4 Yes | 6 No |
Answer / abid hussain
It is the velocity of fluid reaches the weir or notch before flows over it
| Is This Answer Correct ? | 8 Yes | 11 No |
Answer / hemant
it is the rate at which the separation between two moving particles decreases
| Is This Answer Correct ? | 11 Yes | 15 No |
Answer / sajjad
when any fluid has an obstruction while it is flowing then
there is some rise w.r.t previous level i.e vel. approach
| Is This Answer Correct ? | 10 Yes | 25 No |
Which is default or standard size of tiles used in dado bathroom
whats is difference between anchorage length and development length
What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?
how much brick,cement,and sand required in 1cum brickwork(1:4)
a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?
comparision difference between GSB and WBM subbase in road construction
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
how many material required for brickbat water proofing of toilets.
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
For Wet Mix Mecadam design what is Optimum moisture content
how to carry out rate analysis for RCC work in column using M20 ?
1 Answers Mazna Building Contracting,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)