Answer Posted / abid hussain
It is the velocity of fluid reaches the weir or notch before flows over it
| Is This Answer Correct ? | 8 Yes | 11 No |
Post New Answer View All Answers
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what is w/c ratio in dry lean concrete for m10 mix design
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
How to calculate chejja reinforcement
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What is Gsb tollens ?
Time required for curing of wall tiles before fixing
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
Can we apply curing compound on ceiling (slab Bottom)
what is the permanent solution applied for restoration of leaning tower of pisa?
pls give me ans to ACT formula cube testing porpuse
Slab quantity
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?