plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / amitkumarkushwaha
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
| Is This Answer Correct ? | 14 Yes | 15 No |
Post New Answer View All Answers
What is meant by cartesian coordinate system?
What are some facts about concrete?
Explain soil analysis?
Explain what is zoning permit?
Stringer How many cm goes to landind
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
how to stop beam concrete between column
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
What is rolling stock
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What should be the standard roof height like to be?
What is fineness modulus ? and its sieve # ?
What are the advantages of cad?
How much time Required for PPR pipe network testing