plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / amitkumarkushwaha
rcc for per cum
rate 4750
pcc per cum rate
25000
brick work rate per sqm 4000
| Is This Answer Correct ? | 14 Yes | 15 No |
Post New Answer View All Answers
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
How will you reduce the concrete flow after mixing the concrete
Would you cause a 55-gallon drum of water to weigh more by climbing in?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What are the strongest shapes in building?
what is the formula for Mass of cement grout (Dg)=???
is concealed wiring a problem in fly ash brick wall?
what is diffrence between catchment area,watershed and basin?
How do you calculate load bearing capacity of a waffle slab?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
acceptance criteria for concrete works
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
what post do you prefer to work in this company and why do you think you can serve better in such position?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Dear Sir What is the Contraction joint for base Slab