A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
1750Post New Electrical Engineering Questions
what are the different methods for the starting of a synchronous motor.
why the neutral line is not giving shock to us if we touch it ?
Merits & Demarits of Oil circuit & Air circuit breakers ?
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
What is dynamo?How it works and what is the function of dynamo in a DG.
Electrical 'C' license full abbreviation , and full form
3phase motor can be used as a Prime mover for alternator.
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
what is negative and zero impedance in 3 phase induction motor ??
what are the differences between 'exhaust fan', 'heavy-duty exhaust fan' & 'super heavy duty exhaust fan'. what are their power ratings ?
In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?
in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?