Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) hi all, can any one tell me a website or document on basic interview questions on plc for a fresh diploma candidate?
1 3811I've an interview for post of Lecturer in a ece Department. Can anyone send me some possible questions that can be helpful for me???????
15827
Where is iron ferrite found?
What are your future hopes for this job?
what is electrical machines
Which was intel's first microprocessor
explain comutator action in detail.thanks
What is mean by hot and cold loop testing? What is the difference between them?
simplification of Boolean Expression- A+A'B.
block diagram of 2 ups system connected in parallel mode?
what is cyclon seperator and water column?
Write a test case plan for a typical banking application which involves functionalities like Balance enquiry, deposit, fund transfer etc. Make your assumptions and mention the same in your answer sheet.
Why we use Electrical energy rather than any other type of energy, mostly? Explain behavior of open secondary CT and short circuited secondary PT in energized condition?
How to marking the building
why we using different type of microwave antenna we using like one is connected to MMU and one more is connected to other slot what is use of both antenna?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
general diesel engine we are using 15w 40 oil unfortunatley our oiller mis used the oil hudralic oil refilled when he doing the service which kind proplem coming in future?