What is MFT and when it is acted.

HPCL,

2 25835

What are the turbine protections.

2 10438

Is it not bad to bleed steam from turbine stages before utilizing its energy.

2 3045

.What is drip and drain.

NPTI,

2 11618

What happens if there is no HP and LP By-pass.

5 10526

What are the special criteria under which FD fans are switched off during MFT.

1 3128

What happens if air is present in LPH and HPH.

2 10309

What happens if lizard comes in a MOCB

ABB, Reliance,

1 6772

.What do you mean by Turbine Dump.

1 2524

which safety valve will open first if steam is not been supplied to turbine.

Wartsila,

3 9602

What is LB-SR.

2483

why Subcritical has 60% condenser capacity

1 4183

Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880

What is creep, resilience.

2 4477

What is droop.

Dhampur Sugar Mills, Elaf,

2 6739


Post New Power Plant Engineering Questions

Un-Answered Questions { Power Plant Engineering }

By any way can we increase the B check hours from 300 to 500

1695


LAPT working in alternator / generator

2545


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1936


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1196


procedure of how to generate power in solar plant.

1377






What is difference between secondary Air & Tertiary Air and Their use.?

1474


How do you consider that you can improve and what assistance do you need to achieve this

1332


what is the basic use of power plant in equipment

1225


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


what is the meaning of SST300 V56A in SIEMENS turbine

3886


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

514


can dp type level transmitter work in under vaccum condition

1535


What is LB-SR.

2483


what is natural frequency of turbine shaft .

1720


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon