Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


.What is drip and drain.

Answers were Sorted based on User's Feedback



.What is drip and drain...

Answer / vinoth

drip can be access or reuse again.
drain is once through or excluded from the system.

Is This Answer Correct ?    6 Yes 1 No

.What is drip and drain...

Answer / rahul anand

well in power plants drippumps are also used to pump water back into deaerator when stem gets condensed either in GSC or it could be in HP/LP heateors.
Drain is not a part of close loop system ie either we are reusing in water (dm water system)

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

In a coal fired boiler furnace temp. is high but super heater out let temp. low what reason for this?

6 Answers   ABB, Essar, Gayatri,


why the steam turbine is not operated in home(base) load more than 1 hour kindly calrify

4 Answers   TATA,


1.what is the reason for transformer and lightning arrester blast in 33kv system

1 Answers   Afghan Telecom, Integra, Sanghi,


.What are the equipments should run when there is a black out in power plant.

5 Answers  


line safety is not opening but drum safety opens what to do?

3 Answers  


what are the steps of syncronizing the generator with an infinite grid?

3 Answers   Genco, Orient,


Why attemperation is required in HRSG in a combined cycle power plant?

10 Answers   Tata Power,


why Subcritical has 60% condenser capacity

1 Answers  


How do you consider that you can improve and what assistance do you need to achieve this

0 Answers  


Why reheater is not used after IP turbine.

3 Answers   Hindalco, SEC,


I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per liter of diesel. The engines are due for overhauling. is this normal

1 Answers  


How to decide Heating surface area of boiler on their steam generating capacity?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)