After taking shutdown of 11kv feeder, if you see 5kv by phasing stick in the cable side, is it possible to close earth switch in cable.
1906how we can calculate the load appeared on programable logic controller.and what is the method to calculate the scan time of PLC.
1065typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
1289Post New Siemens Interview Questions
What is positive time evaluation?
Which type of diaphragm use in costic line, dm water line, natural gas line, oil line?
What is a custom tag?
Explain what is pop()method in JavaScript?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
What are the different types of sorting? Explain the difference between them.
Mention the differences between thin clients and thick clients.
What is dedicated processor assignment in operating system (os)?
What is an arrays?
how to calibrate steam control valve in steam turbine
What is flush method in hibernate?
How to debug a payroll run?
In the balance sheet, where do you show tds?
What is schema in mysql?
What are the basic operations performed by the decorator?