Answer / s.ravikumar
NORMALLY THE GENERATING VOLTAGE AT ANY POWER STATION IS 11KV.
THEN THE VOLTAGE(11 KV) HAS BEEN STEPPED UP TO 33KV,110KV,230KV OR 400KV.
THE REASON FOR STEP UP IS TO AVOID THE LINE LOSSES DURING TRANSMISSION AND DISTRIBUTION FROM GENERATING STATION TO THE SUPPLIER END(GENERALLY LONG DISTANCE).
ACCORDING TO THE LOAD AT SUPPLIER END THE RANGE OF VOLTAGE VARIES.
EXAMPLE:
SOME OF THE HOUSE HOLD ITEMS ARE 230V(SINGLE PHASE) RANGE:
1.TV
2.IRON BOX
3.FAN,ETC.
AND SOME OF THE HOUSE HOLD ITEMS ARE 430V(3 PHASE) RANGE:
1.3 PHASE MOTORS
SO IT IS CLEAR THAT EACH ITEM HAS SEPERATE VOLTAGE CLASS.SO WE CANNOT GIVE 230KV TO A 230V ITEM(IT DAMAGES THE INSULATION OF EQUIPMENT AND IF NO INSULATION THEN THE USER WILL SURELY GET DEATH).
,HENCE THE GENERATED 11KV IS STEP UP TO ANY OF VOLTAGE RANGES 33KV,110KV,230KV OR 400KV AND IF REQUIRED THE THAT SAME CAN BE STEP DOWN BY TRANSFORMERS LIKE:
1.400KV/11KV
2.230KV/11KV
3.110KV/11KV
AND 11KV/440V
NOTE:IF THE VOLTAGE LEVEL IS HIGH,THEN THAT MUCH OF INSULATION,GROUND CLEACRENCE HAS TO BE MAINTAINED.
| Is This Answer Correct ? | 2 Yes | 0 No |
high voltages are safe method to trasfer power generations
bulk power .
High vloltahe are directly used in iron steel factory arc
furnaces -400kv,230kv to 60,30kv arc furnaces, where
generation source very near or long distace net work.
industries adopt bulk supply.
domestic, medium comsummers are 400v,4W,and 230v -mobile
charger ,tv,washing machines, frinders, .....
| Is This Answer Correct ? | 1 Yes | 1 No |
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
pls tell us AC plant are how do work and parts name with picture
what is the preventive maintence for ht panels and busbars and vcb abd acb's.
why do we need transformers?
how to calculate P.F from kva only?
Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
How do you select a cable size(Cu & Al) for a particular load?
Why star pointed terminal have no current? how?
What is the maxvoltage drop allowed at any healthy joint at full load ?
How to calculate the TR (AC's)
why we +ve load distribution in 24v and -ve load distribution in 48volt in the telecom sector.?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)