1. Synchronization is not required
A. Thermal B.Hydel
C.Wind D.Nuclear
Answers were Sorted based on User's Feedback
i have done diploma and btech in EE and live in Chandigarh so kindly help me how can i make my competency certificate in my area.
what will happen if 11KV is given to 1.5 square mm cable connected with constant load of 10A ?what will be the condition of cable after injecting the voltage?
why core losses are affected with change in voltege in transformer?
a solar energy installation utilizes a three phase bridge converter to feed energy into power system through a transformer of 400v/400v.the energy is collected in a bank of 400v battery and is connected to converter through a large filter choke of resistance 10ohms.1.the maximum current through the battrey will be.2.the kva rating of the input transformer is.
how to compute kAIC? with formulas...
How many points can we have in AC Circuit? Show by giving suitable example?
differtiate between energy consevation and energy efficiency..
how do you tell if a avalanche button diode is a p or an
how much current will be drawn by 3 phase, 415v, 50 hz, 20 ton central ac
What is boost transformer in railway??
Do I need a special Transformer to put 240 VAC 3 phase into it and and get 480 VAC 3 phase out of it to run a machine? Or, do I just use an ordinary step down transformer and step up the voltage? Thanks
In electrical cables what is U and U0 refers?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)