HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED
BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S
MINIMUM DEPTH FORMULA.
Answer / harikrishnan
By determining the stress or load of the buildingb and also based on type of soil. for good construction sandy soil is better.. stress=load/area... p=ultimate crushing stress*area/1+a(effective depth/k)square
| Is This Answer Correct ? | 4 Yes | 2 No |
How can we demolish concrete beams?
for solid cement brick without fly ash,we use dust,6mm,12 mm jelly,water my question is what Proportion we mix dust,6mm,12 mm jelly,water ? for good strength brick.
how to calculate the quantity of steel in a slab , beam and coloumn
What is the volume of 50kg cement bag?
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
how to calculate MR 9(derivation)
what is the technical word for column and beam joint
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
What Reinforcements Are Used In The Process Of Prestressing?
what is the water-cement ratio of mix design while 30mpa in 7 days?
Highest compressive strength of M15 concrete that can be gained at 28 days
What is the strength of cement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)