Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED
BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S
MINIMUM DEPTH FORMULA.



HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RA..

Answer / harikrishnan

By determining the stress or load of the buildingb and also based on type of soil. for good construction sandy soil is better.. stress=load/area... p=ultimate crushing stress*area/1+a(effective depth/k)square

Is This Answer Correct ?    4 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

in which measurment pitot tube is used

6 Answers  


What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..

1 Answers  


how you can say about a slab that it is one way or two way.

6 Answers  


how much shuttering oil required for 100 sqm shuttering?

1 Answers   L&T, NCC,


What is Refuse Area In High Rise Building ?

0 Answers   Arpee Group,


for pretensioning which will yield first and same for post tensioning?

0 Answers  


What is The meaning Of Auto cad And Also Define What Is Drawing According To You

14 Answers   MNC,


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

0 Answers  


What is logic behind the use of Steel bar insted of gold bar?

10 Answers   Rites,


How many bages of cement used in 1cft?and how we calculat sand and agregats

5 Answers  


how should we take soil sample for CBR test?

1 Answers  


How much overlaping required for welding the reinforcement bars in Columns & beams

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)