Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the PH value for boiler water.

Answers were Sorted based on User's Feedback



what is the PH value for boiler water...

Answer / suresh

7-8.0

Is This Answer Correct ?    4 Yes 9 No

what is the PH value for boiler water...

Answer / rajesh girulkar

PH in between 6.5 to 8.

Is This Answer Correct ?    3 Yes 9 No

Post New Answer

More Chemical Engineering Interview Questions

hi can u send me all d technical qus pepar of DRDO?my email id is palmzk@gmail.com

0 Answers  


While there, are many tests available to detect leaks on vessels, is there a technology available to quantify the leak, or measure the flow through a leak?

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.2 : (a) In the pricing of a coupon bond, the formula is : P = c / (1 + r) + (c + B) / [ (1 + r) (1 + r) ] for 2 years to maturity, where c = annual coupon payment (in dollars, not a percent), B = par value, P = purchase price. Five years ago someone bought a 20 year coupon bond and would like to get rid of it now : A coupon rate of 7 %, it matures in exactly 2 years, par value is $1000, current interest rate is 5 %. (i) Find the value of c. (ii) Find the value of r or interest rate. (iii) Find the value of P. (iv) Guess the formula for P when the maturity period is 3 years, if such formula for 1 year duration is P = (c + B) / (1 + r). (b) In lemma of Ito on a Forward, recall that a forward contract is priced at : ln F = ln S + rT. Find the value of F in 5 decimal points when S = $100, r = interest rate = 0.05 / year, T = duration = 1 year.

1 Answers  


plz send me hpcl and reliance entrance test papers on my id s,kumar_bk@yahoo.co.in

1 Answers   Reliance,


What type of pump may be appropriate for a liquid near saturation, a low flow rate, and very limited npsha (net positive suction head available)?

0 Answers  


What is a 'saltation velocity' and how is it used in designing pneumatic conveying systems?

0 Answers  


BIOCHEMICAL ENGINEERING INSTRUMENTATION - EXAMPLE 29.1 : In the application of Theory of Spectrometry in spectrophotometer, let n = N x C x V, V = A x t, e = a x N where n = number of molecules, N = Avogadro's number, V = volume of cuvette, A = area of cuvette, t = thickness of cuvette, C = concentration of fluid in the cuvette, e = extinction coefficient, a = effective area of molecule. (a) By using calculus in dI = -I x a x N x C x dt, prove that ln (I / Io) = -a x N x C x t, where dI is the small difference in I and dt is the small difference in t. I = intensity of light. Io = initial intensity of light. (b) Show by calculations that ln (Io / I) = e x C x t based on the answer in the previous question (a). (c) Find the equation of log (Io / I) as a function of e, C and t based on the answer in the previous question (b).

1 Answers  


Is there a difference in mtd (mean temperature difference) between 'e' and 'j' (divided flow) type shell and tube heat exchangers?

0 Answers  


what is the discharge pressure formula, for calculating discharge pressure?

2 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.

1 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.10 : Let D be the random outcome of rolling a dice once. A new dice has values of D* = D - 3.5. There is a total of n rolls of a dice. (a) Find the variance for D* by using the formula 6 V = [ D* (D = 1) ] [ D* (D = 1) ] + [ D* (D = 2) ] [ D* (D = 2) ] + [ D* (D = 3) ] [ D* (D = 3) ] + [ D* (D = 4) ] [ D* (D = 4) ] + [ D* (D = 5) ] [ D* (D = 5) ] + [ D* (D = 6) ] [ D* (D = 6) ]. (b) Calculate the standard deviation of D* as a square root of V. (c) Another new dice has values of D** = kD*. (i) Find the value of k so that D** has a standard deviation of 1. (ii) Find the values of D** for each outcome of D = 1, 2, 3, 4, 5 and 6, when the standard deviation is 1. (iii) Given that the average score of a dice is 3.5, find the equivalent, new and improved model of a dice, Sn in term of n and D**. (iv) Find the expected value of D** as the average of D**.

1 Answers  


Why is post-weld heat treatment sometimes necessary for welded vessels?

0 Answers   Aramco,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)