15. List 3 of your weakest points as a worker?
Answers were Sorted based on User's Feedback
Answer / subhasbabu
1.WORKER FIRST OBSERVE THE NATURE OF HIS IMMEDIATE BOSS
2.HE LIMITS THE LEVEL OF PERFORMANCE
3.GENERALLY WANTS TO ESCAPE FROM HIS DUTIES, WHEN HE WAS
ALLOTED ADDITIONAL WORKS.
4.ALWAYS COMPARE WITH HIS SALARY AMONG HIS COWORKERS
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / haleedai
'I am sometimes too much concerned with details..
| Is This Answer Correct ? | 2 Yes | 4 No |
will fix foundation bolts at site with out template is there any procedure?
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
weight rcc m30
what is the meaning of m35 grade concrete ?
2 Answers Aparna Constructions,
what is lap length? why it is required?
which method is used in semi-rigid connection design??
how calculate the ms beam weight?Please give me formula details?
can we go for short rcc column without any steel rienfocement carrying truely axial load???
List out the types of roofs?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)