Answer Posted / subhasbabu
1.WORKER FIRST OBSERVE THE NATURE OF HIS IMMEDIATE BOSS
2.HE LIMITS THE LEVEL OF PERFORMANCE
3.GENERALLY WANTS TO ESCAPE FROM HIS DUTIES, WHEN HE WAS
ALLOTED ADDITIONAL WORKS.
4.ALWAYS COMPARE WITH HIS SALARY AMONG HIS COWORKERS
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
how calculate the bearing from two coordinates?
why we use 19x9x9and 20x10x10 but not other
on what basis the partial factor of safety are decided? form the load combinations
how to calculate steel for slab or footings?
What is the use of water table & Kreb stone for drain
how to find ssm in foundation?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
what would be the design load of R.C.C Cooling tower per cell.?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .