Answer Posted / subhasbabu
1.WORKER FIRST OBSERVE THE NATURE OF HIS IMMEDIATE BOSS
2.HE LIMITS THE LEVEL OF PERFORMANCE
3.GENERALLY WANTS TO ESCAPE FROM HIS DUTIES, WHEN HE WAS
ALLOTED ADDITIONAL WORKS.
4.ALWAYS COMPARE WITH HIS SALARY AMONG HIS COWORKERS
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what is E
Explain what are the problems one might face while having a Cantilever balcony?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
What is the tensile strength of wood?
What is different between DI Pipe and CI pipe?
What things architect have to take care of before starting any project?
Explain how you can turn off the display for dimension in CAD?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What is Density of cement, sand & aggregate ?
Formula for calculation volume of essentric footing
what is escalation?how it is done?
howto calculate the quantities of material used in fly ash brick after finding the volume??
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?