11. What was the reason for you to quit your previous job?
Answers were Sorted based on User's Feedback
Answer / praveen gupte
Because the project is complete & they are transfering me a
long distance. so its a good time for change.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / afsar ansari
Because the project is complete & they are transfering me a
long distance. so its a good time for New callanging job
wich Growgth my future.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / sudesh
Bcoz Company Shifted there Office, But Didn't tell me ;-) ;-) ;-)
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sjtbehera
some prsonal poblem that i have to leave that job
Is This Answer Correct ? | 0 Yes | 10 No |
how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.
4. What is your philosophy / attitude towards work?
what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.
how calucate cement sand ratio for plstering
What is the difference between normal brick & concrete hollow blocks in all aspects?
What is fineness modulus ? and its sieve # ?
What does civil engineering mean?
Is density and unit weight are same, if not why both r having same unit, wats the difference between them.
why we use cement for concrete
Which tests are performed on soil to decide the type of foundation to be provided.
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
What is the consumption of Brick in one meter cube both 6inch & 4inch thick