11. What was the reason for you to quit your previous job?
Answer Posted / praveen gupte
Because the project is complete & they are transfering me a
long distance. so its a good time for change.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Why should you show Client/Engineer activities clearly on the project plan?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is horizon or horizontal mining?
what is difference between GTS bench mark and temporary bench mark
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
what is the composition of good brick ?
what are the types of design? which type of method is used at what type of design & why?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Did any of the egyptian pyramids ever fall down?
In which code the the maximum height of concrete casting has been explained
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What is the Null Point of chimney in Power Plant
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches