11. What was the reason for you to quit your previous job?
Answer Posted / praveen gupte
Because the project is complete & they are transfering me a
long distance. so its a good time for change.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are the advantages and disadvantages of using plastic and timber fenders?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the average density of soil?
what does the track parameter mean in staad.pro?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
what is work of planning deptt. in any construction compny (in road project)
What is horizon or horizontal mining?
What ingredients with% found in ppc cement??
how many cement used in single story residential building per sqft
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How will be cutting in timber plate size 600*400 column size
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is the diameter of the 3"inch nails?