4. What is your philosophy / attitude towards work?
Answer Posted / ramana
Our work is more fast, efficiency than the others .
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
what is the difference b/w full length and cutting length?
how can i calculate cement in brickwork
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Which architectural movement is also known as jazz moderna?
What is absolute coordinates?
Time required for curing of wall tiles before fixing
what is m30 in concrete tiles
What is the difference between EPC,DBOOT and BOOT.
What is difference between limit state and working stress method? How it is applies in building structure.
What is a tensile strength? What is the tensile strength of wood?
What is the difference between tor steel and tmt steel?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
how much quantity of cement,sand and water required for 1 sq feet flooring work .