WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY
EMPLOYED

Answer Posted / s.manjula

I WILL TRY TO INTRODUSE NEW TECHNOLGY FOR DEVELBMENT OF OUR
COMPANY GROWTH.........

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1750


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3716


Why nautical mile is different from statute mile?

738


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2095


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

1895






what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2637


Technical Question of Civil Engineering

1896


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2270


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

733


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1348


residential projects,structural.

2415


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2143


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

516


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

1634


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1642