WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE
INTERVIEW?

Answers were Sorted based on User's Feedback



WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?..

Answer / v.rajesh

I can't say about others.As far as I am concerned ,I will
be honest to my work, second to none. I will put up all the
knowledge, skill and resources to accomplish whatever job
is entrusted to me.If this answer of mine suits your
organizational vision , then,I could be hired.

Is This Answer Correct ?    6 Yes 0 No

WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?..

Answer / rana yadav

Because I am eligible up to the qualification and having
rich experience to meet your requirement.

Is This Answer Correct ?    7 Yes 3 No

WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?..

Answer / rajesh pal

becuse i am eligible for your requirment qualification &
quick lerner and i want to go on top step by step just few
time. i like to deffernt challenge. if you select me i
shall reach on top to your company through out my positive
filling

Is This Answer Correct ?    6 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What is chemical composion test

0 Answers  


Can a 24" RCC beam can rest on 18" RCC beam.

2 Answers  


how many square meter plastering get from 1 cubic meter cement mortar for a thickness of 12mm

3 Answers   Home,


How much concreat we make by 1 bag cement? (ratio- 1:1.5:3 or 1:2:4)

2 Answers   Castles Consulting Engineers, KCP, Opaque Infrastructure,


How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC

2 Answers  






Will going from a 3-tap to 6-tap increase water pressure?

0 Answers  


i have a bar diagram as straigtht bending, but i maked circle bend, how to i justify to others?

1 Answers  


Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?

28 Answers   Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

0 Answers   ACMK,


How will be cutting in timber plate size 600*400 column size

0 Answers  


we do not provide reinforcement bar through the centre of a column.why?

2 Answers   IIT,


what is the calculation of raw material for 0.35cum of m-15

0 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)