How to start testing after project kick off ???
Answers were Sorted based on User's Feedback
Answer / aparna
Testing team needs all the documents to be bundled and released.
In case of Black Box testing, tester will get the idea by
reading all those documents then he/she can start the testing.
Is This Answer Correct ? | 15 Yes | 4 No |
Answer / manijanmi
Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.
Is This Answer Correct ? | 8 Yes | 4 No |
What is the format of bug report?
What are the deliverables of Test Plan
What is shakedown testing?
Is 100% Coverage is possible in Testing ?
wat will be your testing approach for this product from project start to finish(product is landline phone)
What is the difference between functional and nonfunctional testing?
what do u do when u enter at ur system till end of the day?
What is traceability matrix? Is it required for every project?
What are the differences between test strategy and test plan?
WHAT IS A DIFFERENCE BETWEEN BUG AND DEFECT
I’ve been using a test tool for quite some time but it has not lived up to the expectations. So I’m planning to invest in a good one. Please suggest some?
What the purpose of testing?