Answer Posted / manijanmi
Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
Explain paradigms for interfacing module?
Explain what is the difference between regression testing and retesting?
what documnets qa engineer need for starting qa?
What is verification?
What is Defect Density ? What is the formula? Explain with example
Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh
Kindly tell me some good websites from where I can study about sqa and testing(advance and new material)
What is the difference between functional and nonfunctional testing?
What is breadth testing?
What if the software is so buggy it ca not really be tested at all?
How can new software qa processes be introduced in an existing organization?
What is extreme programming and what is it got to do with testing?
Explain the difference between the verification and validation?
how much it is necessary that if u r a sqa engineer then ur programming should be strong or either u have only concepts of it but u r not a good programmer.If the person is not a good programmer then do they are able to make their carrer in this field of qa and do it has good scope for them being not a good programmer?
What is quality audit?