How to start testing after project kick off ???
Answer Posted / manijanmi
Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
Describe bottom-up and top-down approach in testing?
What are the tools used by a tester while testing?
insurance domain interview questions ,i done project on insurance (manual testing)
What is mr and er?
In case you have any doubts regarding your project, how do you approach?
What are the types of documents in sqa?
can 2 tier architecture can be change as a 3 tier architecture
iq test
What are the factors responsible for the estimation of system integration test cycle and total integration time?
Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh
What are the functions of the Quality Assurance Group (QAG)?
What is random testing?
What is mr and what information does mr consists of?
Diffrence b/w compiled module and shared repository?
prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.