How to start testing after project kick off ???
Answer Posted / manijanmi
Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
What are the actual QA processes run in software compamy ?
create a daily status report or list the items you will cover in a status report
Why is automation testing preferred over manual testing?
can anyone explain the working of tsys application in credit card industry
what for cmmi and iso(what are they) are used and how we can use them in our testing and whole work related to sqa.Do it has any kind of format if it has kindly tell me from whr i will get it kindly give detalied answer?
In one project, How much “%” effort made by SQA Tester? e.g. : developer = 35%, manager = 10%, etc.
What is application binary interface (abi)?
What is the difference between the test plan and test strategy
why do not u try to get job in your core side(example :-eee)?
What are the key components of a test case template
How to find all the bugs during first round of testing?
What are test driver and test stub and why we need them?
Hi every body i am going to take the ISTQB Foundation level Exam on March 21th 2010, Could any one send some list of question papers and latest Dumps to My mail id: (saran_loyola05@yahoo.co.in). Advance thanks. Regards, Saran
An automated bank teller system?
What are test driver and test stub and why it is required?