How to start testing after project kick off ???

Answer Posted / manijanmi

Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe bottom-up and top-down approach in testing?

676


What are the tools used by a tester while testing?

628


insurance domain interview questions ,i done project on insurance (manual testing)

23469


What is mr and er?

585


In case you have any doubts regarding your project, how do you approach?

615






What are the types of documents in sqa?

619


can 2 tier architecture can be change as a 3 tier architecture

1606


iq test

1374


What are the factors responsible for the estimation of system integration test cycle and total integration time?

641


Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh

1576


What are the functions of the Quality Assurance Group (QAG)?

3177


What is random testing?

627


What is mr and what information does mr consists of?

613


Diffrence b/w compiled module and shared repository?

1582


prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.

1648