Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why Parallel operation of two Transformer are Required?

Answers were Sorted based on User's Feedback



Why Parallel operation of two Transformer are Required?..

Answer / hemachandra.m

main reason to parralel operation of the transformers are
for the load sharing purpose means if we have more load
than the excisting t/f then wecan do the parralel operation
of the two transformers that two transformers must be same
voltage ratio,vector group,and turns ratio.

Is This Answer Correct ?    10 Yes 1 No

Why Parallel operation of two Transformer are Required?..

Answer / binay agrawal

after parallisation of trafo.,we can give a stable voltage
to the load, also if there is any probelem in any trafo. ,
than we can transfer all the the load to the another .

Is This Answer Correct ?    8 Yes 7 No

Why Parallel operation of two Transformer are Required?..

Answer / akshay khadse

when load current increases above the capacity of one x"mer , we can connect one more i parallel instead of replacing the existing with bigger one.
it is possible to repair or maintain the x"mer in parallel connect one by one without shutting off the plant.
if a 1 large x"mer used its failure will shut off the installation .the parallel x"mer solve this problem

Is This Answer Correct ?    0 Yes 0 No

Why Parallel operation of two Transformer are Required?..

Answer / prasad

I would like add a point to reena:
Generally we choose transformers with same capacity and impedance for redudandancy in Process plants to avoid power interruption to process.. and we do paralleling of trfs to carryout load shiftings without interruption especially critical loads.. (this is not in the case of lighting etc. where interruption really doesn't matter.)

Is This Answer Correct ?    0 Yes 0 No

Why Parallel operation of two Transformer are Required?..

Answer / reena

Main reason for parrallal operation of trasformer is to work without failure because we need power for 24 hours.

If failure occur or in cse of maitanace we can provide power to the consumer.

Also, one reason is that in parralal operation transformer share the total load.So, instead of one transformer if we have two it save total cost as well as the mainance cost coz we can manage with one if other has fualt so, we can atleat give power to the critical load.

Is This Answer Correct ?    7 Yes 9 No

Why Parallel operation of two Transformer are Required?..

Answer / mahendra

Becoze when connecting Xmer in parallel frequency ,Voltage
and phase Sequence should be same.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

what is RNG in the DG synchronizing by PLC?

0 Answers  


Relation between pyramids and electrical technology?

1 Answers  


What is meant by Im=30mA@Vk/2. How to know the kee point voltage for CT design

0 Answers  


Rated moter voltage and frequency is 380volt 60 hz but moter is running at 380votac 50hz is this harmful for moter winding

1 Answers   Infosys,


How efficiency of thermal plant can be improved?

0 Answers  


can anyone provide me a amf panel control wiring using ec-2 relay?

0 Answers   Electro Tech,


for distribution line ratio of x/r 1.<0.1 2.>10 3.>1 4.<0.01

3 Answers   HAL, HPPSC,


fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be

0 Answers   NIC,


what is closing resistor in circuit breaker? why it used?

3 Answers  


If I have a LT panel 3ph, 415V, 50Hz which demand load-600kw, how we can calculate its body earth strip size.

1 Answers  


draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it

0 Answers  


how to identify the cable quality and what is flame proof cable

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)