What is reporting hiearchy in testing? Who report to whop
and complete hiearchy including developers
Answers were Sorted based on User's Feedback
Answer / sushant sinha
Reporting Hierarchy,
Its depend upon company to company,In my company the
hierachy is
Reporting to Developers-->cc Devloper Team Leader-->Project
Manger-->Bussiness Team who involved in the project.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / gj
Reporting Hierarchy,
Its depend upon company to company,In my company the
hierarchy is
Reporting to Developers ---> cc Developer Team Leader --->
Project Manger ---> Business Team who involved in the project.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / seshu
Hi Friends,
Reporting structure may varie company to company.
Test Engineer --> Test Lead--> Test Manager--> Delivery
manager
Thanks
seshu
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / naveen
Developers-->cc Devloper Team Leader-->Project
Manger-->Bussiness Team who involved in the project
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / s.ghosh
Reporting Hierarchy,
Its depend upon company to company,In my company the
hierachy is
Reporting to Developers-->cc Devloper Team Leader-->Project
Manger-->Bussiness Team who involved in the project.
| Is This Answer Correct ? | 0 Yes | 0 No |
Why I think QA is the positon for me
how will you know whether your reported defect rejected?
What are the contents of Test Plan?
plz explane about agile model
An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.
How do we do testing if requirements are not documented properly?
can we test the product with out documents?
what are the fields in Bug Report
How do we prepare weekly and monthly status-report as QA?
can you plz tell me the all documents to be completed by a manual tester?
Does any one have Performance test plan and Security test plan? Please help me as i need it ASAP... Thanks in Advance.
Hello friends.. Can anybody here explain me or provides me notes of these topics in detail with interview questions... Topics are:- History of Software Engineering Waterfall Model Prototype Model Spiral Model Software Quality Testing Software Development Life Cycle Software Testing Life Cycle white box testing methodology black box grey box Definition of Quality,Quality Assurance,Quality Control Verification and Validation Static Testing Dynamic Testing only on my gmail mca.rachna21@gmail.com