how will you report defects in your company?
Answers were Sorted based on User's Feedback
Answer / v.vengateshbabu
If we find any defect then we will raise in a defect
tracking tool and assigning to the developer in same tool.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / rohit.qtp
Use Can use Bugzilla
Its nice tool.
You can mail defect to Test lead, Developers, test Manager.
But mail format is quite boring
Anyone know any tool with high class mail formating?
Please reply if u hv worked on dat.
Regards
Rohit Sharma
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vijay
I will raise the defect in Quality center and assigned to
the developer and send mail through QC to the developer
with details about defect.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / usha
We reports our defects to our defect tracking team via test
lead.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / murthy
Through Defect Tracking System (When we log a defect it
will automatically trigge mail to assigned developer.)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / harjeet kaur
We will post the defect in the defect tracking tool used in
the company and assigned to the developer and set its state
as "New"
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ratheesh palakulath
The process I follow is:
1) Fail the respective Test script, if TC exist for the bug.
2) Gather the Required Docs (Screenshot, Error Log, etc)to
report the Bug.
3) Prepare the bug in Respective bug Template and send it
to Testlead for approval.
4) If approved Add the Bug in Bug tracking Tool.
a) Enter Bug Description
b) Steps to reproduce the Bug
c) Expected Result
5) Add the email ids of the Concerned persons in bugzilla.
6) Attach the necessary documents in Bugzilla.
7) Add the supporting document details (Like UC version..)
8) Add the Responsible Developer as "Development Team
Lead", they will in turn reassign it to the respective
developer.
9) Keep the issue status as "Open".
8) Generate the Issue in Bugzilla.
9) If TCs doesn't exist for the Bug, identify the
respective Testobjectives and develop Testcases and map the
TCs with the Bug ID.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / kalpanareddy
we will report our defect hrough BUG TRACKING TOOL
ORIENTEAD REPORTING.
bug tracking tool means s/w application which can be
accessed only by authorized people & provides all
facilities for bug-tracking & reporting.
in which we will maintain Common Reposiotory(CR)
& in tht Defect Profile Template(DFT).
all of test engineers will enter in to CR & updates
their defects in DFT so tht Developers will enter in to CR
& will check tee defects.if they accepts tht defects the
will download & rectifies.
| Is This Answer Correct ? | 0 Yes | 0 No |
If you are working closely with business team, after receiving the requirements, if you think requirements need some changes, When will notice they need to be modified?,when will you approach them.exactly in what phase of SDLC?
An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.
How do we prepare weekly and monthly status-report as QA?
can you plz tell me the all documents to be completed by a manual tester?
Hello friends.. Can anybody here explain me or provides me notes of these topics in detail with interview questions... Topics are:- History of Software Engineering Waterfall Model Prototype Model Spiral Model Software Quality Testing Software Development Life Cycle Software Testing Life Cycle white box testing methodology black box grey box Definition of Quality,Quality Assurance,Quality Control Verification and Validation Static Testing Dynamic Testing only on my gmail mca.rachna21@gmail.com
How do we do testing if requirements are not documented properly?
write test case for ecomerce shopping
i have completed software testing.Can anyone send sample and simple srs document for writing test cases.
what will you do when your reported defect rejected?
Is Test report same as Bug report....? I have to give Test Report to the client for my Application ....and as it started all of sudden i did not make the test cases and started of testing .....The bug Tracker where i report the bugs has a facility to download the Bug reported in word or in excel format....It has the detailed description of "version" of appliation tested, whom assigned .., resolved , closed..then the steps to reproduce the bug and all...Is the documnet test report...
Why I think QA is the positon for me
What is test strategy..?