Answer / anand kumar c
Starter is used for the protection of the motor(High
starting current problem).
Starter is a part of control panel.
And control panel will be consisting of all the protection
for motor(which is required as by the user)
| Is This Answer Correct ? | 14 Yes | 4 No |
Answer / krishan kumar nangia
STARTER IS TO PROTECT THE MOTOR BY OVERLOAD TRIPPING,
AND THE CONTROL PANEL DOES THE SAME FUNCTION BUT
SIMULTANEOUSLY DISPLAYS THE CURRENT AND VOLTS IN METERS
IT MAY BE DIGITAL DISPLAY OR UNIVERSAL TYPE.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / praful nandankar
starter is used to limit the starting current.As in case
of IM if it is directly switched to the supply,it will
draw 3% to 4% of full load current which is not suitable
for other equipments due to large voltage drop.
Control panel is for overall equipments and power systems.
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / prabhakar
Starters are used for motors
controlpannels are used to control electrical equipments
| Is This Answer Correct ? | 3 Yes | 4 No |
which relay is better , instantaneous or IDMT relay .
kVA rating of open delta connected transformer is _____% kVA rating of delta/delta connection A 50 B 70.7 C 57.7 D 75.7
Rotor resistance starter is used to obtain= A increased starting torque B decrease starting current C decrease starting loss D increase efficiency
HOW DO YOU PROVE THE HIGH VOLTAGE CABLES OR BUSBAR IS DEAD EVEN AFTER IT IS DE ENERGISED
What is pd controller?
how to choose the cable rating for load (KW)? EXAMPLE.50KW load
14 Answers ACC, NCUI, Polycab, PowerSol, Siemens, SW,
How to calculate the efficiency of Turbo Generator(Alternator) in general....?
What is relation b/w Transmission Lines & Communication Lines ?
IF 8255 CONTROL WORD IS 94H,Tell the chip port work mode ?
HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com
what is difference between 2 pole structure and 4 pole structure in transformer yard
How to discharge the battery as quickly as possible ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)