if 300 hrs not comleted at wat interval b.c,d checks og
take place
Answer / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
| Is This Answer Correct ? | 0 Yes | 1 No |
What is Negative Potential Bias
why servomotor motor? where i apply for best output?
What is the relation between frequency and motor rpm?
when motor taking high amp what happen.
what is earthing
Can we perform parallel operation of two transformers when one transformer on load?
I am selected in OCL(Orissa cement Limited), but they have a Tech PI round their at their plant.Anybody has any idea that what kind of questions they are going to ask??Please guies help me. I am in serious headache.I have heard that huge elimination is done at there.
how u measure/calculate renge of capacitor,capacitor has no any rating tag.what is the theory of measure of capacitons.
In which reason, one end of CT secondry get connected with Earthed? Normaly S1 of CT. Why????
Capacitor bank require for 1000amp load
2 Answers Biodeal, Pharmaceutical,
Why OLTC(On Load Tap Changing)transformer is not recomended for improving voltage instability?
What is the difference between hot and cold loop testing?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)