if 300 hrs not comleted at wat interval b.c,d checks og
take place

Answer Posted / vinod arya cbre

B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between PLC and Embeded system

968


What is real time power factor control panel(RTPFC)?

3834


i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester

1695


WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?

5595


Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above

1354






how to test reverse power trip?

3887


What are the main significances of root locus?

708


Why power genaration in India is at 50HZ while America its 60HZ

1881


I WANT BHEL PREVIOUS QUESTION

1837


what is the difference between active power and reactive power and apparant power in practical as well as theoritical

1454


Currently what is the highest capacity (MVA) of SPPg generator available in the market?

1335


In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]

1452


In a single how much maximum current and watts using

1650


by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.

1525


What kinds of decision are made about CT from it's Knee point(voltage & current)?

3817