if 300 hrs not comleted at wat interval b.c,d checks og
take place
Answer Posted / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
While testing a ZCT what parameters have to check or measure?
As i want some model question paper in basic computer science and history please send me immediately sir
What is the capacity of the Fastners 12mm?
Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT?
What is the RME and explain the full form and what is the RME work?
Single line digram for 11 kV to distribution use go,la and do
salam,hi, i need to know what the spesification of 300amp msb...
how to test the electrical panel.ht lt mcc pcc.
How to measure power in 2 or 4 or n phase circuit? Please give me a formula.
how we calculate the withstansing current capacity of wires&cables?
how to produsing geretor power
What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.
My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?
please send the IS strandard for electrical to sakthi_murugan86@yahoo.co.in