if 300 hrs not comleted at wat interval b.c,d checks og
take place
Answer Posted / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How are load losses and no-load losses measured at site in a DG set?
how brushed dc motor operating ?
would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......
What are the difference between normal application Transformer and Solar application Transformer?
What is the meaning of C1, C61, C91 cable
What is the RME and explain the full form and what is the RME work?
Main advantage of auto transformer over two windings transformer is that A it needs no cooling B it uses only one winding C core losses are reduced D it has simple construction
how to find the capacitance value of the motor while running??
how could we calculate the no of outgoings from a 800 watt distribution board
Describe the control mechanism of missile launcher???
What is ideal IR values for ground and neutral.
why there using acb enclosure in big buildings
If there are two transformer having rating of 2.5mva, 6.6kv/440v(satr-star),and the load is 600kw then what is better to maintain less losses in transformer having both transformer in parellel or only single transformer connected to load? Please give calculated answer
Which Class insulation is prefered for the sandwich Busducts ? Why?
What are the three types of compensators?