if 300 hrs not comleted at wat interval b.c,d checks og
take place
Answer Posted / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the difference between PLC and Embeded system
What is real time power factor control panel(RTPFC)?
i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester
WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
how to test reverse power trip?
What are the main significances of root locus?
Why power genaration in India is at 50HZ while America its 60HZ
I WANT BHEL PREVIOUS QUESTION
what is the difference between active power and reactive power and apparant power in practical as well as theoritical
Currently what is the highest capacity (MVA) of SPPg generator available in the market?
In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]
In a single how much maximum current and watts using
by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.
What kinds of decision are made about CT from it's Knee point(voltage & current)?