Answer / kokila
when testing environment was supporting and when enough
knowedage of the project
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / jagdish hatwar
When all the neccessary documents such as SRS,BRS r
available as well as project plan, test plan is sufficient
then & then tessting of project have to start.
| Is This Answer Correct ? | 0 Yes | 0 No |
1) In a software development project Spiral Model was Chosen as the development model. What is the best-suited reason for this? A)This model is the oldest and most widely used paradigm for software development. B)In this model users get the feel free the actual system and developers get to build something immediately. C)In this model risk analysis is done coupled with evolutionary S/W process model with the iterative nature of prototyping and controlled systematic aspects of water fall model D)This model combines elements of Classical model with this iterative philoophy of prototyping.
this question i got from iflex anybody pls give some useful information. is it possible to get severity1bugs in thirds round testing before release after two rounds of system testing completed?
what did your base to your test cases?
How would you define a "bug?"
what is test case? what it consists? what are the types of test cases?
what is entry / exit criteria and pass / fail criteria ?
What is the bigbang approach in integration testing?
14 Answers CarrizalSoft Technologies, TCS,
What all types of testing you will do for banking website?
what the diff b/w Smoke Testing and Santy Testing?
10 Answers Cap Gemini, Financial Technologies,
Whenever the project is at maintenance phase the client will be using his own data- is the same data given to the test engineers or any other dummy data
define incident and test ware.
What is your testing approach/plan if requirements are frequently changing?