Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If the characteristic Impedance is equal to load Impedance
then……
a) voltage will be increased b) power transmission is
zero c) …… d) max. power is transmission to load

Answers were Sorted based on User's Feedback



If the characteristic Impedance is equal to load Impedance then…… a) voltage will be increased..

Answer / bala

d)max power is transmission to load

Is This Answer Correct ?    6 Yes 1 No

If the characteristic Impedance is equal to load Impedance then…… a) voltage will be increased..

Answer / dipeeka

d)max. power is transmission to load

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

The neutral to earth connection in my industry is showing a zero reading (shorted). I have a machine which has to be installed where neutral to earth is not shorted and shows a leak voltage <3 Volts. Please suggest me how it is possible.

6 Answers  


In what way does the variable ratio-arm improve the usefulness of the wheatstone bridge?

1 Answers  


How do u analyse protection fault when vcb tripping on load

0 Answers  


hi Is there any possibilities to find out the rotation of a shaft or something else by using electromagnectic waves or by IR rays.If s then can v change the dir., of rotation of the same by remotely?& how? plz dn't any1 say "NO r CAN'T"

0 Answers  


difference between main metering kiosk and check metering kiosk

0 Answers  


WE ARE PLACE A NEW 75 KW MOTOR FOR JPF.IT IS CONNECTED IN M.C.C. WHEN WE ARE STARTING M.C.C.INCOMER IS TRIPPED.THEN WE ARE CONNECTED IN P.C.C WITH A MM30 RELAY PROTECTION THEN WE ARE STARTED MOTOR WILL RUN SMOOTHLY.

0 Answers  


why the desirable efficiency for a motor is 60%, but in case of transformer, it is above 90%?

1 Answers  


What is a unit of gravity (Battery)

9 Answers  


what is the difference between ac and electric

1 Answers  


what is tpmo switch

3 Answers  


when a machine act as genartor and as motor?

2 Answers  


How to design harmonic filter at the project stage without nowing the harmonics levels

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)