Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


voltage at generation stage is usually- ?

a.11kv b.33kv c.66kv d.220kv

Answers were Sorted based on User's Feedback



voltage at generation stage is usually- ? a.11kv b.33kv c.66kv d.220kv..

Answer / vijay

In india,alternator terminal voltage is3.3kv then through the transformer it is step up to 11kv and given to the plant substation and there it is made 33,66,132kv according to the grid voltage.

Is This Answer Correct ?    0 Yes 1 No

voltage at generation stage is usually- ? a.11kv b.33kv c.66kv d.220kv..

Answer / mrudang

the voltage generation level is always
11kV ,20kV ,6.6kV
Not more than this after generate this level
we step up this voltage to 33kV,66kV,220KV

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

Are generator action and motor action relates to a particular machine only?

2 Answers  


What is floating earthing?

2 Answers   Equate,


whose motors self starting synchronous or Induction motor?give fact reason why not self starting another mother

2 Answers  


How the size of electic machine vary with the sped? Between slow and fast running machines of equal ratings, which one is more economical to design?

1 Answers  


What is Minimum permicible meggering value for following 1) LT Panels (Ph to Ph / Ph to Earth) 2) 11 KV, HT Panels (Ph to Ph / Ph to Earth) 3) 11 KV Cable 4) LT Cable

1 Answers   BFL,


what does kirlosker deals with?

3 Answers  


Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.

0 Answers   PKR,


how to remover corona effect and hysteresis losses from contactor

0 Answers  


why industry prefer ht motor instead of lt motor.

0 Answers  


how to calculation increase capacitor,increase power factor for three phase.

0 Answers  


What are armoured cables?

2 Answers   IOCL,


How to take Transformer oil Break down voltage test?

9 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)