What should be the minimum depth of ground laid 66 kv ht
cable?

Answers were Sorted based on User's Feedback



What should be the minimum depth of ground laid 66 kv ht cable?..

Answer / ram kumar singh

Min depth in ground for 66 KV cable is 1.2mtr.

Is This Answer Correct ?    3 Yes 0 No

What should be the minimum depth of ground laid 66 kv ht cable?..

Answer / srinivas

The minimum depth of ground laid 66kv ht cable is 1.5mtr.

Is This Answer Correct ?    3 Yes 1 No

What should be the minimum depth of ground laid 66 kv ht cable?..

Answer / satish

Minimum depth of ground laid 66 kv HT cable is 1.5Mtr. in
case direct, and 1Mtr. in case through pipe/closed duct
(Stone ware pipe,CI,Spun reinforced pipe).

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is IP65 & What is its advantages

1 Answers  


Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.

0 Answers  


Two electronic energy meters are connected to seperate phase wires, but connected to a looped neutral. Are these going to function correctly?

8 Answers   DRDO,


If rotor works in clock wise what happens

0 Answers  


what is the formula for efficiency of francis turbine and generator for hydropower? what is best way to select francis turbine and generator?

0 Answers   HAL,






why in India it is maintained for exactly 50HZ frequency, why it is not that 49Hz,why it is so?

2 Answers  


What is the use of Exciter in generator? & what will be the current of Exciter in 500 KVA DG Set?

2 Answers  


How generating electric power export to grid from the generating station ?

0 Answers  


How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.

0 Answers   Allied Group,


why we use to transmit the power in three phases intead of single phase ?

4 Answers  


what will happen when power factor is leading in distribution of power?

10 Answers   AMET, JTO, Power Grid,


Why the CT Secondary is rated as 5A generally?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)