Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Construction of Diesel generator set?



Construction of Diesel generator set?..

Answer / sk ajibar rahman

Diesel Generator are constructed with an engine and alternator. Engine is the mechanical part of the generator which is work as a revelation. It is coupled with the alternator rotor. Alternator is an electrical part of the DG sets, which is generating the electricity.MAINLY WE CONVERT THE MECHANICAL ENERGY TO ELECTRICAL ENERGY. The engine constructed with the liner, piston, shaft,crank, head,etc. And alternator is constructed with the armature,field,stator, rotor etc.

Is This Answer Correct ?    29 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

1. what is the meaning of bus? 2. what is the dc transformer? How it work 3.what is the function of the serge absorber? 4.How the CT and PT rating calculate/

1 Answers  


What Is Sampling?

0 Answers   Mahatma Gandhi University,


How power is transferred from one winding to another in an auto-transformer? A) electrically B) magnetically C( both a & b D) neither of above

3 Answers   ISRO,


What is the criteria for deciding whther fire wall is required between two power transformers

1 Answers  


How to calculate capacitor bank size at a load 800kVA.

0 Answers  


what's the reson that,Load is not same on VFD I/P and O/P Side.whenever DOL condition load is same I/P and O/P side.

1 Answers  


After synchronization with grid what is the demand value QKVAR and how we will maintain that?

0 Answers  


i heard that power factor(PF) is the main concern for industries, if they are maintaining PF around 0.6 they will be fined for that. now the question is, how can they improve the PF ranging between 0.9 to 0.95 which is safe for them i,e escaping from the fine?

5 Answers  


HOW TO CALCULATE EHV CABLE SIZING?

2 Answers   L&T,


Which transformer is suitable for 220/11 kV, 60 MVA, distribution , Y-Y or D-Y or Y-D, give comparison for the same.

3 Answers  


Q: How to calculate Transformer losses , tell us by Formula.

0 Answers  


What is the mechanism of WTI

0 Answers   JBS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)