whitc material has high tensile strength
Answers were Sorted based on User's Feedback
Answer / bhimanna kattimani
Multiwalled carbon nanotubes have the highest tensile
strength of any material yet measured, with labs producing
them at a tensile strength of 63 GPa, still well below
their theoretical limit of 300 GPa. The first nanotube
ropes (20 mm long) whose tensile strength was published (in
2000) had a strength of 3.6 GPa, still well below their
theoretical limit
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / kripeshmeethal
Fiber-base composite material has high tensile strength.
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / siva
steel with hollow circular cross section has high tensile
strength
| Is This Answer Correct ? | 0 Yes | 1 No |
Define Grashof number and its significance?
What is the purpose of gravity disc in centrifugal purifier?
What is the specific heat of water?
0 Answers ABC Inc, RRB, SFL, Siemens,
how gravity filling machine is designed
what is the diffrence between pelton and kaplan turbine
Can you explain axial play and radial play
If a person is working in R&D organisation but he has not been involved in R&D activities. So Which types of questions may be asked if he wants to get opporunity in mechanical R&D activities?
how bulk density can be calculated suggest with practicle example
What is the torque required at M6, M8, M10, M12, M14, M16, M18, M20, M22, M24 Bolt or give me any chart for this?????????
what is cswip?
What is the use of the governor on diesel generator
5 Answers GLA University, Standard Chartered,
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)