which types of tests are required after commissioning of
6.6 kva tranformer?
Answers were Sorted based on User's Feedback
Answer / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suresh
to check the oil temp indicator, winding temp indicator,
check the oil level in conservator
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / kashifhabib
I think all the test are performed before commissioning.
Is This Answer Correct ? | 1 Yes | 7 No |
How many companies are manufacturing 33 KV HT Breaker
how can i change the rotation of the AC single phase induction motor and show me by diagram
please I wont know how to calculate the vector group for power transformer ZNyn11 best regard.
What is a pulse transformer?? Can it be called as a dc transformer??
how to calculate slip ring induction motor stator and rotor currents??
how to decide the ratings of the MCCB,MCB in electrification.give me the proper thumb rule or procedure.
what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker
why some transmission lines have 7 wires n why some have 3 n 4??
in ceiling fan and table fan what is the rotating part and what is the stationary part?
If the maximum demand is 120 KVA in a building, then what is the Current taken according to load given ? Formula for it ?
Can we convert off line transformer to on line transformer
DC Motors applications used in Lift/Elevators
8 Answers IOCL, SCS, Usha Martin,