which types of tests are required after commissioning of
6.6 kva tranformer?
Answers were Sorted based on User's Feedback
Answer / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suresh
to check the oil temp indicator, winding temp indicator,
check the oil level in conservator
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / kashifhabib
I think all the test are performed before commissioning.
Is This Answer Correct ? | 1 Yes | 7 No |
Sir, plz tell me how droop setting is done in parellel operation od DG set ? please give practical example ?
who is make controlling in the reactive power that genarted in AS genrator(the exitaion currnt or exitation voltge)
STATE AND EXPLAIN SUPER POSITION THEOREM.
what is OLTC and difference between RTCC and OLTC
If 110V DC Coil Contactor taken 15ma DC on load,than how much AC current wil be taken?
0 Answers Lafarge, Shree Cement,
why does in transformer the v/f ratio constant?
What is meant by stator?
what types of cable used in underground coal mining?
Sir We have a REF relay connected to 10MVA(Y-Y) Transformer.on External earth fault REF relay trips along with earth fault relay.The REF relay has no complant as we tested relay.Why is it happening?
How does numerical relay work?
how to check avr of dg set of 125kva
Define protection core in CTs Ex. 5P10, 5P20 etc.