which types of tests are required after commissioning of
6.6 kva tranformer?
Answer Posted / kashifhabib
I think all the test are performed before commissioning.
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
While performing stability test of differintial cts how to know the voltage and current on both side of the transformer?
What do you mean by lighting transformer?
what is distribution board?
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
In Power cable specification what is U0/U and Um.
According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
What is knee point voltage of transformer?
I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.
Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????
what is mean by drives?
If the feeder rating is 7.5 kw or 10 HP star-delta feeder, MCCB is taken as 63 a, contactors-32 a, how much will be the OLR rating or which range OLR should be considered when we concern about type-2 coordination?
In the formula : Knee point voltage = Burden X alf / class, Please inform what is alf? regards Shashidhar M.R.