which types of tests are required after commissioning of
6.6 kva tranformer?
Answer Posted / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which test will be more severe for VCB?
can we use NPT glands in LT panel
what is the need of starter in tube light and what type of starter is used in that?
in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????
What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?
What is difference between mcb and mccb.
operation of diesel generator
difference between main metering kiosk and check metering kiosk
what is mean by NPS (Negative phase sequence)fault? what is the difference between EFR & OCR faults?
Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.
sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder
why should the lowest unit of a testing transformer ( cascaded transformer ) have higher power rating??
What is meant by rotor?
whats the differece between Exd and Exe
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.