which types of tests are required after commissioning of
6.6 kva tranformer?
Answer Posted / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is mean by D.O. in distribution line poles?
Where is servomechanism used?
Why can't we take NO LOAD TRIAL of motors having V1 mounting??
33kv substation lay out details & line to line & line to earth measurements
What do you mean by distribution transformers?
what is the Pickup/drop off ratio in BCPU relays
What is time invariant system?
what is the control circuit for operating the clean room air shower
The shot circuit in any winding of transformer result? Explain
What will happened if the neutral of secondary of Xformer ( Star point) Note it's above KVA rated Xformer
what is the total power generation in india?
Is a 300w induction motor used in a food processor as powerful as a 1000w DC motor.
Where I can get the sample question for post of Junior engineer electrical-II For RRB Bhubaneswar.
How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?