which types of tests are required after commissioning of
6.6 kva tranformer?

Answer Posted / m k

after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which test will be more severe for VCB?

2227


can we use NPT glands in LT panel

1333


what is the need of starter in tube light and what type of starter is used in that?

1519


in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????

1572


What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?

1379






What is difference between mcb and mccb.

647


operation of diesel generator

1545


difference between main metering kiosk and check metering kiosk

2351


what is mean by NPS (Negative phase sequence)fault? what is the difference between EFR & OCR faults?

1782


Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.

2108


sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder

1557


why should the lowest unit of a testing transformer ( cascaded transformer ) have higher power rating??

1884


What is meant by rotor?

810


whats the differece between Exd and Exe

4288


A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.

923