what are the documents(Construction point of view for a
process plant) submitted by contactor initially entering in
to new site for client?
No Answer is Posted For this Question
Be the First to Post Answer
Can Any body tell me about the Contact or Email id of any good Consultancy which help me to find a job in Instrumentation Field in India .I have Six years of Work Experience in the Same field.Please revert me back on shammi_gwalior@yahoo.com ?
Any one can help me to identified, how can we interchange the device in FF
in current transmitter why we use 4-20ma ???
what is pyrometer? which purpose it has to be used?
how to derive kg/cm2 to mmwc? complete derivation.
What is i/e or o/p transmitter(ma/v)?
If I want to buy a pressure switch & 3-way valve for hot water application then witch parameter I should consider.
Describe the basis on which alarms should be generated and how their associated priority is determined
List three types Level Transmitters with their working principles
1 Answers ABB, Bapco Bahrain Petroleum Company,
What is loop1 and loop2 in MTS LT?
why we are maintain the gap voltage in vibration probe when installing time can explain me?
hi this is noor i wnt know the procedure and precations errection for PRESSURE AND DP transmitters? how to take impusle line for level and flow?(water and steam) impulse line sizes? and type of material ? plz give me answer / reffer any website ? to me "mail2noor.hyd@gmail.com"
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)