what are the documents(Construction point of view for a
process plant) submitted by contactor initially entering in
to new site for client?
No Answer is Posted For this Question
Be the First to Post Answer
Why is a dead weight tester so called by that name?
In a class of 150 students, 40 passed in Social Studies, 90 passed in Science and 30 failed in both the subjects. vi)How many students passed in at most one subject among Science and Social Science?
7 Answers CAT, CGI, Cipla, KHK, Visa,
How to calculate the flow rate in Vortex flow meter?What is K factor?Can you give me an example calculation to understand the same as better?
WHY RESISTANCE TEMPERATURE DETECTOR IS AN ACTIVE DEVICE
why the SCAN time of DCS is more & that of PLC is less? if the SCAN time of DCS then why we use DCS.
what is use single seated and double seated valve?
2 Answers Doha Petroleum Construction DOPET,
SOME OF YOUR QUESTIONS ARE NOT MAKING ANY SENSE SO TRY AND PUT IN A LITTLE BIT MORE EFFORT BEFORE YOU POST A QUESTION. WE WILL ONLY HELP THOSE WHO WE CAN SEE ARE TRYING TO HELP THEMSELVES.
what is dc moter.
0 Answers Jindal Steel and Power, Lupin,
why we are using 4-20ma why cant we use 4-40ma
What is mean by AC voltage and DC voltage
How vortex sensor used for steam flow measurment can be checked on line i.e without taking out from process line.
What is 1:1 redundancy ?