depending on what we can choose the rate of mccb
considering that we know the total load
Answers were Sorted based on User's Feedback
Answer / jaswinder
The rating of MCCB depends on FLC for small motors but for
larger motors where factors like Load factor , diversity
factor are taken into consideration for cal of FLC and
accordingly rating of MCCB is Selected.
| Is This Answer Correct ? | 1 Yes | 3 No |
what is the function of turbo in dg sets
what u meant of power plant?
What is inverse definite minimum time lag relay? Where is it use?
Is it advantages of having star-delta vfd than normal star vfd , if yes why?
why are the a.c.series motors preferred for electric traction
what is the difference between direct loading and indirect loading?
in a silicon diode we can measure .7v in a voltmeter.but why we can't use this voltage for using?
electric shock is due to current r voltage.?
12 Answers National Steel, TCS,
where this neutral connection goes after returning from the load(home ,factory,industries).Is it grounded at the transformer side or atthe generator side .If it is grounded then we also ground the earth connection.is there any problem with this.
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
can we use trip light with bus coupler?
what is the difference b/w UHVDC and HVDC(LIGHT)?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)