Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much percentage(%) of load can feed in power
transformer?



how much percentage(%) of load can feed in power transformer?..

Answer / heeth

usually power transformers are designed to run at an
optimum efficiency nearing to full load rating. So usually
power transformers are loaded around 90% of their rated
value..

Is This Answer Correct ?    35 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

current and voltage equations for a star connected load fed from a delta connected load.

1 Answers  


can any one know is sbi interview based on merit or based on roll number

0 Answers  


bitumar

0 Answers   Bhel,


how a.c. genarator control power factor when its conected to grid supply by incrising or decresing excitation voltage.

1 Answers  


During the main stator winding insulation testing (phase to ground)of 11kv alternator (Lerysomer) i found 0 and resistance with multimeter and found 20 killo ohm while the power cables are connected both end (Generator & VCB). In VCB PT (Potential transformer) are connected. Please any body explain that method of insulation is correct or not? also describe of PT connections

1 Answers   Private,


What we mean by vintage of an engine+Generator?

0 Answers  


What is Plank's Law?

0 Answers   Godrej,


draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words

1 Answers  


What is value of earth resistance required for substation and equipment earthing and what are the reference guidelines

0 Answers   Glenmark,


What is a doble test

1 Answers   KPSC Karnataka Public Service Corporation,


What is Earthing?

16 Answers   Essar,


Why can't we take NO LOAD TRIAL of motors having V1 mounting??

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)