testing of transformer
Answer / binod
THE FOLLOWING TEST ARE THE MINIMUM REQUIRED BEFORE CHARGING
A TR.
1)short cicuit test
2)opencircuit test
3)insulation test
4)magnetic core blance test
5)tan delta test
6)transformer oilo B.D.Vtest
7)silicagel color test
8)w/t&o/t functioning test
9)buchhols contact operation test
10)prv working test
Is This Answer Correct ? | 6 Yes | 0 No |
Benifits of 3ph 4 wire metering over 3ph 3 wire
total numbers of earthing of a transformer
what is the magnitude of earthing and neutral voltage
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
how to handle 2500 kva transformar
why do mostly prefer to generate and distribute electricity in 3 phase..not in 4 phase or 5 phase.??
Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere
0 Answers Kazi Farms, SKI Carbon Black,
What is the minimum value of hfe for the oscillations in transistorized rc phase shift oscillator?
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
what do you know about electrical
I want to ask a question which i faced during testing of Capacitive Voltage Transformer in AIS. We have measured the C1 , C2 individually , but when we start to measure the total C1+C2 , the testing equipment shuts down and says low loading. Kindly is it possible to find the total capacitance by using measuring device. kindly briefly explain the procedure.
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
0 Answers Eprosys Engineering Consultants,