Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

testing of transformer

Answer Posted / binod

THE FOLLOWING TEST ARE THE MINIMUM REQUIRED BEFORE CHARGING
A TR.
1)short cicuit test
2)opencircuit test
3)insulation test
4)magnetic core blance test
5)tan delta test
6)transformer oilo B.D.Vtest
7)silicagel color test
8)w/t&o/t functioning test
9)buchhols contact operation test
10)prv working test

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the basic insulation levels & what its Unit

2019


how r charge carriers produced

2082


we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.

2065


What is rotary phase converter?

1090


Details about Flux Compensated magnetic Amplifer starter for motors

2018


from generating station If 400v LT line length is 1000m how much voltage is drop and how do i calculate it? which cable will be use for this line?

2029


HOW TO REDUCE POWER PLANT AUXILIARY POWER CONSUMPTION?

3416


Explain difference between stand by earth fault and residual earth fault protection?

2013


along with technical test papers

1608


Define coil span?

1077


XYZ

2143


How good are you in resolving the commercial issues to Employer's advantage?

2360


How to confirm the Phase shifting Transformer VECTOR GROUP relation , as below ZNy11.45d10.45-ZNYy0.15d11.15

3265


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

976


how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)

2366