Answer Posted / binod
THE FOLLOWING TEST ARE THE MINIMUM REQUIRED BEFORE CHARGING
A TR.
1)short cicuit test
2)opencircuit test
3)insulation test
4)magnetic core blance test
5)tan delta test
6)transformer oilo B.D.Vtest
7)silicagel color test
8)w/t&o/t functioning test
9)buchhols contact operation test
10)prv working test
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is magnetizing current test in power transformer
HI....HOW CAN BE MESARED THE VALVE OF NEUTRAL GROUND RESISTOR WHIC IS LOCATED AT SWICHGEAR ON GENERATOR SIDE....
1.25 kg of hydrogen are burnt with stiochiometric air, the mass of air in kg required is
what is metering cum synchronizing panel and how it is used?
What are the advantages of thermal power plant?
What is the reason that the humming sound is coming from the induction furnace panel?
What is MS-EXCELL?
Why we are going for converter transformers for DC drives application instead of distribution transformer?
What is the temperature PROFILE OF A FLUID W. R. T. Distance from a sphere to which it is IN CONTACT which is at constant temp.?
Why sometime AVR and sometime Booster coil is used in Alternator? what is the diferance between AVR & Booster coil due to which they are selected
What is a single phase autotransformer?
Why power factor should not be in leading (capacitive) mode of any load.
What shall be the secondary output voltage if the primary winding of a 220/6V, 50 Hz transformer is energized by an 110V, 60 Hz supply?
Dyn1 transformer vector group testing how to do
Can an inverter be used as a converter? How?