Currently iam working in a small concern as a test
engineer, i have 3.6 yrs exp in manual testing, currently
iam looking for other concern, but some my friends saying
that testing is no longer, plz switch over to designing,
but iam interested in only testing, i want to know whether
the Testing has a boom or not? plz guide me
Answers were Sorted based on User's Feedback
Answer / pradeep
People have wrong perception.As long there is s/w there
will be testing. Since there are lot of people available in
the market for testing and so the requirement may not sync.
The market is stable now and people see it as downfall. My
advice to all testers is upgrade your skills. Learn
Automation tools,framwork,do certifications like ISTQB
foundation and advanced levels, ITIL V3 certification etc.
This will help you in your career advancement.
All the best!!
Regards,
Pradeep
| Is This Answer Correct ? | 6 Yes | 0 No |
Hi Friend
No field or path is wrong, always that work, which you have
enjoyed or give the 100% satisfaction.
the Market of testing is also depend on IT, wait my Dear,
when ever the Market is up, the testing will also boom.
thanks
prashant
s/w test engineer
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / welwishers
if you have real time environment knowledge, then u must
have to keep going on. And some of the peoples putting many
a fake like me. So if u have the same problem then u might
be change your track. Else if i'm wrong then keep going on
with the same domain,
Thank u.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sri
The future for Testing is getting decreased considerably.
So, all Testers need to go to Programming side rather than
testing. The competition for Testers is very high.
People think that as long as Projects r there, testers also
will be there. S, that's true...but the strength will be
lessened as the s/w market is down.
So, for freshers, i advice not to go into Testing side.
In your case, as u have 3+ exp, u can continue with Testing
only!!!
| Is This Answer Correct ? | 0 Yes | 6 No |
When do you prepare Requirement Traceability Matrix(RTM) before testing aor after completion of testing?
14 Answers AppLabs, IEG, Satyam,
What is defect density?
10 Answers Qualtree Solutions,
9.Are you exposed to any automation tools?If yes your role?
what will be the usability testing of gmail's inbox page
what is major challenges in Real time system testing? Explain the way of Testing for Real-Time Systems.
How many Test-Cases can be written for the calculator having 0-9 buttons,Add,Equalto buttons.The testcases should be focussed only on add-functionality but mot GUI.What are those test-cases?
How do we decide that testcases covers all the requirements?
is traceability matrix prepared by jr tester or sr tester or test lead?
who is releasing the project?PM/TL?
can i manage putting fake experience in manual testing what they will do if am caught
What is Buddy testing?
I am uma new commer for this site? I have some doubt's pls clarify it..... I finished my B.Com and S/w Testing Course Now iam serarching a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,Matrix for Banking,ERP Projects etc.,