How to make vector group test of transformer?

Answers were Sorted based on User's Feedback



How to make vector group test of transformer?..

Answer / mprajaneb

vector group testing: Assume that the terminals of the
primary windings are denoted as A, B, C in counter clock
wise direction and for secondary winding as a, b, c also in
counter clockwise direction. short circuit the terminals A
and a, and apply LT supply to the three terminals of HV
(Aa, B, C)
For Dy1 transformer: VbB = VcB and VbC grater than VcC.
For Dy11 transformer: VbC = VCc and VBb less than VcB.
For Yy0 transformer: VBb = VCc and VbC = VBc.

Is This Answer Correct ?    4 Yes 0 No

How to make vector group test of transformer?..

Answer / debasrit das

i need some more answers about vector group testing

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why are use 22 kv 3ph supply ?

1 Answers   IOCL,


WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?

0 Answers  


What type of tranformer generaly at soft wares like capacity 2000 kva 1800 kva etc iam confused it CT or PT OR distribution tranformer

3 Answers  


Differentiate between digital phase converter and ordinary phase converter.

0 Answers  


how many minutes or seconds taken by the transmission of electrical power from generating end to distributing end?

3 Answers  






I am working in transmission network, one of my 66kv line having short distance about 6km, when sending end voltage is 67kv receiving end get 69kv, i want to know that, does distance affects in this matter, please explain in this matter & if possible answer me on my mail id, kaushikkumar.vanavi@getcogujarat.com, kaushik.vanavi@gmail.com

5 Answers  


what is the acceptable value of TAN DELTA and dissipation factor for 11kV, 1.75HP Motor?.

0 Answers  


IP55 protection stands for

1 Answers   Hofincons,


What is mimimum di -electric strength value for 33 KV transformer OLTC oil

0 Answers   Franke Faber,


During Load testing of battery charger with temporary AC Generator .When reach 70% load Generator immediately shutdown .we could not able to Recognize ,what is exactly problem .Please kindly clarify us

1 Answers  


PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

0 Answers   RRB,


I'm looking for a mnaual set for a Teradyne J750. Softcopy would be preferred but I'll take what I can get.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)