How to make vector group test of transformer?
Answers were Sorted based on User's Feedback
vector group testing: Assume that the terminals of the
primary windings are denoted as A, B, C in counter clock
wise direction and for secondary winding as a, b, c also in
counter clockwise direction. short circuit the terminals A
and a, and apply LT supply to the three terminals of HV
(Aa, B, C)
For Dy1 transformer: VbB = VcB and VbC grater than VcC.
For Dy11 transformer: VbC = VCc and VBb less than VcB.
For Yy0 transformer: VBb = VCc and VbC = VBc.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / debasrit das
i need some more answers about vector group testing
Is This Answer Correct ? | 0 Yes | 0 No |
What is the difference between security constraint unit commitment and security constraint optimal power flow?
0 Answers College School Exams Tests,
what is bausbar?
How will you determine the rating of a motor for continuous duty variable load motor applications?
if the load is reactive then what is the use of calculating the real power and what is the use of reactive power if my question is wrong please excuse me..
What are the main parts of VCB?
WHY IS wet surface used for grounding???
can u give me a brief idea about power line carrier communication ??
is there any difference between protection C.T and measuring C.T?if yes then what is the difference?
4 Answers BARC, Century Rayon,
Why one side of secondary of transformer is earthed, to supply single conductor of electric traction system?
why there is a high voltage line in multiplication of 11?i.e.- -66kv,11,kv,22kv
What are the advantages and disadvantages of oil filled transformers?
2 Answers Mercantile Marine Department, Studio College,
what is NGR in generator?