in my office to access data fast i replaced 8 port hub with
8 port dlink switch my network connectivity is gone
all the led keep blinking do you i have to change cabeling
or change the switch
Answers were Sorted based on User's Feedback
Answer / guest
It depends on the way the cabling has been done. You should
check the RJ45 connectors for Full Duplex CAT5 connectivity.
May be simply re crimping properly will solve your problem.
The cost can be of RJ45 connectors only to be changed on
both ends
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / manoj
You should check the cable that again wrongly connect to switch(loop connection)example: same switch both port connected
| Is This Answer Correct ? | 0 Yes | 0 No |
what is your self n what is your hobise n why?
what is erp manufacturing perspective??
TDS calculation
5 Answers Brakes India, Kotak, V-Trans,
where do you see yourself after 5 or 10 years
4 Answers Hotel Jobs, Vodafone,
what is proxy?
Which managerial function gives attention to influencing and motivating employees to improve performance and achieve corporate objectives?
7. (a) How do you implement internal controls in IT systems? (b) How to design internal controls over financial reporting, when financial reporting is performed totally from the software application? Explain briefly the major points. (c) What are the additional controls needed, when the software interfaces are webbased? Explain the materiality of the payroll processing functions to be performed by webinterfaces from the control perspective.
why u choose mba after bca?
why prototype is used?
I'm working with a crosstab in cognos now. Page 1 contains crosstab Page 2 contains list Fact - Revenue Dimension - Product line, Year If I click on the revenue (cell value) it should goto the particular record in another list which is located in a separate page. However, the fact could not be bookmarked. I don't know why. Do you have suggestions? Thanks in advance.
This is related to Medical Transcription field. As i am above to get the call from the company, I just want to prepare for the interview for the post of Auditor and I have just never faced the telephonic interview and very rare attempted the interview in companies as I have worked for very few companied.
What are the practices you follow for closing a project and meeting the conditions required to establish closure?
Business Administration (517)
Marketing Sales (1279)
Banking Finance (3209)
Human Resources (747)
Personnel Management (68)
Hotel Management (29)
Industrial Management (113)
Infrastructure Management (14)
IT Management (97)
Supply Chain Management (16)
Operations Management (39)
Funding (79)
Insurance (494)
Waste Management (1)
Labor Management (48)
Non Technical (73)
Business Management AllOther (546)