Designing of bridges goes in following steps:
1) selecting suitable location after sufficient geographic
survey, hydrological survey, geological survey,etc.
2) after selecting the location you have to decide what
type of bride will be suited for ex. steel or arch or RCC
or prestressed, etc. depending upon length of bridge,
geological conditions, purpose etc.
3) once the type is decided then comes the part of load
considerations as under:
* DL, LL, Wind induced Loads, Earthquake induced loads,
hydraulic forces, centrifugal forces if any, upthrust,
stresses due to thermal changes etc etc...
* for this some IRC Specifications are to be followed.
4) after load calculations and various load combinations
the individual members are to be designed.
I hope this answers your question....
for more information look out in text "Bridge Engineering
by S.P.Bindra"....
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
Define mirror?
How much quantity of rod binding work by a rod binder per day
why are you joining in this (applied post) job and your aim for this job
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
can stub column take the load as main column
How to arrive dry volume of concrete (1.52 to 1.57) ?
how to calculate testing date
What ingredients with% found in ppc cement??
trapozidal
what is that one cub metre plaster in cemant and fine sand
what is the hanekom repairing material after concreting work
can you provide a link for manual design of building?
Why reinforcement done in shorter span in two way slabs
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete