hi, i am appearing in HPCL(CIVIL ENGG.)exam.
plz send me placement paper of this exam if u are having
No Answer is Posted For this Question
Be the First to Post Answer
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Define What is the origin of name Railway Sleepers?
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
2 Answers Unity Infraprojects,
how we can say that concrete is a plastic concrete
what is two point problem.
Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?
what are the Cement Coefficient for Block Work & plastering Work?
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
calculate the quantity of water for 1:6 cement mortar
0 Answers Pratibha Industries,
what is the weight of 10mm,20mm,40mm aggregate
WHAT TYPE OF BINDING WIRE IS USED IN OFF SHORE STRUCTURES. WHEATHER COROSIVE OR NON COROSIVE LIKE EPOXY COATED,PLASTIC COATED ETC.
What is the mixing ratio of M7.5,m10,M30,m35&m40?
15 Answers Reliance, Umiya Construction,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)