percentage of metal,clay or soil & water in water bond
macadam roads to know the quantities for each in total
volume of 11500 cubic meters


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?

4 Answers  


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

0 Answers  


how do you calculate cubic meter to brass

3 Answers  


1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?

1 Answers   BPO, Vastu Vihar,


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

0 Answers   ACMK,






how can u extent the final setting time of cement?

2 Answers   Sobha Developers, TNPSC Tamil Nadu Public Service Commission,


Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand

2 Answers  


I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?

3 Answers   L&T,


what is the minimum compressive strength in 7 days for m20,m25,m30

7 Answers  


As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.

2 Answers  


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

0 Answers  


How many layers in 12mm and 18mm plywood?

6 Answers   JMC Projects, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)