what are the duties of Quality Assurance engineer and QA
Tester?plzzz answer as soon as possible thanku
Answers were Sorted based on User's Feedback
Answer / malini
Duties of a QA Engg.
Generally a QA Engineer and a QA Tester would mean the same
in real time environments.
However, when it comes to hierarch levels..
QA Manager will have QA Test Lead under him and QA Test
Engineers under the lead..
General Duties of the QA would be:
1. To collect all the docs like: BRD(business req doc),
technical tp, functional tp from the management or QA
manager.
2. To review the above docs.
3. To moderate the FTR (Formal Technical Reviews)
4. To write RTM
5. Design Test Cases.
6. Once the build release to QA, begin the testing
7. Log the defects in teh Defect tracking tool.
8. Conduct client meetings.., review defects with the dev
team and demo the defects to the developers if required.
The above are in general and can be disscussed in detail
further.
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / ramesh yatam
QA: Verification
QC: Validation.
QA means to avoid the Defect.
QC means to prevent the Defect.
QA is related to Process.
QC is related to Product.
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / sm
Following are the duties of QA/QC Engineer:
identifying Test Scenarios based on SRS
Involving in black box testing.
Performed Functional and Regression Testing.
Execution of Test Cases and generating Reports.
Defect Tracking and classifying them based on severity.
Bug reporting.
| Is This Answer Correct ? | 4 Yes | 2 No |
Based on what doccuments do you start scripting?/ Testing?
Identify correct statement
can you tell me test cases this the sketch is below here name is a dropdown list like different phones nokia,lg,samsung,motorola,sony,micromax and there is a submit button below name model submit
How will you track defects? Or Bug life cycle?
Which are the possible test cases can U write for Combo box validation ?
Can you please explain about the erp project
Hello Friends,I want some clearence regarding. Test report and Final report.
which model are you following
When priority and Severity is opposite then which one required to solved first? Bug Number 1=(Severity 1 & priority 3), Bug Number 2=(severity 3 & priority 1), (high=1,Medium=2,Low=3)
how to perform reviews
what is the difference between system development life cycle & software development life cyle(sdlc) what is system development life cycle
How can we change session time ?In JAVA application