what is pass and exit creteria
Answer / biju
The Test plan will consists of many important criteria’s to
be fulfilled. One of the main topics is Entry & Exit
Criteria. There could be many Entry and Exit criteria’s in
a project.
For Example
Entry Criteria -Business requirements is given to the test
team for analysis
Exit Criteria- Test Estimation Signing off
Entry Criteria – Application installed on UAT environment
Exit Criteria- No High severity/Priority defect
reference:
http://www.sphur.com
| Is This Answer Correct ? | 1 Yes | 0 No |
1.For a single module how many builds are possible 2.what will be the max or min time to finish up an single module
What is risk analysis and what kind of risk you foud while testing
what is traceability Matrix??
what is Gui testing?
there is one website i.e google.com.but in our project displayed that goole.com then what is seviority and priority for this scenario
What is 2-tier architecture, 3-tier architecture?
Hi, Im B.E 2011 pasout,worked in back office till now, but now im searching for job into manual testing with fake exp of 1 year..Plz suggest me how to prepare for an intervw? how to gain real time testing knowledge? Is dere any site where i can practice testing?
what and all i should be prepared for attending the software testing interview,because iam confused with how to get prepared,please some one tell me the main topics to get prepared for it.
What is cookies?How do you test cookies?
if it is a web testing,what is a dead link and a broken link.,and what are the other things we test in a web application related to functionality other than field level and form level validations.
If u need to get stressed & work more than then timing. How comfortable u r. If asked to work on weekends
How will you prepare traceability matrix if there is no Business Doc and Functional Doc?